Requirements of Order |
Complete all soil excavations, backfillings, and the reseeding of all soil impacted by the fire water runoff; provide EPD with lab data of confirmatory water and soil samplings to verify restoration to all soil impacted by fire water runoff; complete restoration of VFW Post 5290 Lake and provide documentation; prepare/submit closure report detailing corrective actions taken as result of accident; BioLab shall properly restock VWF Lake, after findings that Lake is suitable to support fish habitation |