Facility |
Hand Construction & Projects, LLC |
County |
Grady County |
Cause of Order |
Failed to implement BMPs resulting in a significant discharge of sediment into a water of the state; failed to identify a second outfall for the land disturbance; failed to sample stormwater discharges at the second outfall |
Requirements of Order |
Have a certified Design Professional amend the ESPCP to include all outfall locations and additional sediment control BMPs; fully implement the amended ESPCP and all BMPs at the Site; remove the sediment that was discharged in the adjacent water of the state; collect a stormwater turbidity sample from each outfall during the next qualifying rainfall event and submit |
Settlement Amount |
$5,000.00 |
Legal Authority |
Water Quality Control Act (including Surface Water Allocation) |
Date Executed |
19‑Nov‑2021 |
Publication Date For Executed Order |
22‑Nov‑2021 |
File Attachments |
None
|