Skip to main content

Enforcement Order EPD-AQC-7290

Facility Dart Container of Georgia
County DeKalb County
Cause of Order Failing to maintain sufficient logs in a form suitable for review during the inspection of startup and shutdown activities to ensure that emissions from the pentane recovery system are not introduced as combustion air for the boiler prior to establishment of a flame; Failing to maintain sufficient logs in a form suitable for review during the inspection confirming the pentane emissions from the pentane recovery system are not introduced to a boiler that is not in operation; failing to have logs detailing the firebox temperature of the boilers; the pre-expanders, boilers and pentane recovery system were operated without a device to monitor the vent position of the valve that exhausts emissions from the pentane recovery system to the atmosphere
Requirements of Order Submit a monitoring plan detailing which data logs serve to satisfy the inspection and recordkeeping requirements of each condition
Settlement Amount $7,500.00
Legal Authority Air Quality Act
Date Executed 3‑Aug‑2023
Publication Date For Executed Order 7‑Aug‑2023
File Attachments None