Enforcement Order EPD-AQC-7318
Facility | SNF - Riceboro |
---|---|
County | Liberty County |
Cause of Order | Failed to continuously monitor the temperature for the Flocryl Acrylates Continuous Plant Thermal Oxidizer at the fire box or in the ductwork immediately downstream of the fire box; failing to continuously operate an oxygen analyzer system on each boiler; failing to continuously monitor the operating load on each boiler |
Requirements of Order | Comply with Rules and pay penalty |
Settlement Amount | $8,750.00 |
Legal Authority | Air Quality Act |
Date Executed | 11‑Dec‑2023 |
Publication Date For Executed Order | 18‑Dec‑2023 |