Facility |
Bulldog Solar LLC |
County |
Warren County |
Cause of Order |
Conducted construction activities within the buffers of State Waters without applying for or receiving a buffer variance from the Director; continued to conduct land disturbing activities prior to receiving the design professional's 7 day inspection letter; failed to properly design, install, and maintain BMPs; stormwater discharges resulting in sediment deposition into State Waters; failed to incorporate 4 additional BMPs; failed to perform sampling; failed to provide certain records; failed to provide a summary of violations |
Requirements of Order |
Purchase 3,700 stream mitigation credits from within the same service area as the buffer impacts; provide a stream buffer restoration plan to restore the impacted stream buffers and State waters; have a certified design professional conduct a 7 day inspection of any redesigned BMPs and acquire the 7 day inspection letter; notify EPD if an alternative design professional is chosen |
Settlement Amount |
$97,000.00 |
Legal Authority |
Erosion and Sedimentation Act |
Date Executed |
20‑Dec‑2024 |
Publication Date For Executed Order |
6‑Jan‑2025 |