Skip to main content

Enforcement Order EPD-WP-9784

Facility Mr. Chirag Patel
County Gwinnett County
Cause of Order Conducted land disturbing activity within the buffer at the Site
Requirements of Order No additions or changes that would result in additional encroachment into the buffer may be made to the existing structures; BMPs shall be properly designed, installed, and maintained until the Site has achieved final stabilization; mitigate for the deck remaining in the buffer
Settlement Amount $2,638.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Date Executed 14‑Apr‑2026
Publication Date For Executed Order 20‑Apr‑2026
File Attachments None