Enforcement Order EPD-WP-9784
| Facility | Mr. Chirag Patel |
|---|---|
| County | Gwinnett County |
| Cause of Order | Conducted land disturbing activity within the buffer at the Site |
| Requirements of Order | No additions or changes that would result in additional encroachment into the buffer may be made to the existing structures; BMPs shall be properly designed, installed, and maintained until the Site has achieved final stabilization; mitigate for the deck remaining in the buffer |
| Settlement Amount | $2,638.00 |
| Legal Authority | Water Quality Control Act (including Surface Water Allocation) |
| Date Executed | 14‑Apr‑2026 |
| Publication Date For Executed Order | 20‑Apr‑2026 |
| File Attachments | None |