Date of Posting: Monday, July 16, 2018

Enforcement Order EPD-SW-2801

Facility Coreslab Structures (Atlanta) Inc.
County Clayton County
Cause of Order Failure to operate inert landfill in compliance with Solid Waste Rules
Requirements of Order Remove crushed product within 5 years of the effective date of the Order, or initiate full closure of the landfill
Proposed Settlement Amount
Legal Authority Comprehensive Solid Waste Management Act
Publication Date For Proposed Order 7/16/2018
Date Comment Period Closes 8/15/2018
Send Comments To Mr. James Cooley
Director of District Operations
Environmental Protection Division
2 Martin Luther King Jr. Drive SE, Suite 1456 East, Atlanta, GA 30334

james.cooley@dnr.ga.gov
(770) 387-4929

Enforcement Order EPD-HW-1874

Facility Dallas Plating, Inc.
County Paulding County
Cause of Order Failure to obtain a permit for treating and disposing of hazardous waste from the containment area via thermal treatment and evaporation; failure to make a waste determination for the dust coming from the dust buffer and the sludge from the evaporator as required by the Notice of Violation; failure to maintain and operate the Facility to minimize the possibility of a fire, explosion, or any unplanned release of hazardous waste or hazardous waste constituents to air, soil or surface water. The soils around the chrome stripping area are discolored and the dust from the grinding and buffing of metal items is being release from the building
Requirements of Order Respondent shall not conduct treatment or disposal of hazardous waste without a permit, any such treatment or disposal shall cease immediately; w/in 30 days the Respondent shall submit to the Division a waste determination conducted in accordance with 40 CFR 262.11 for the dust generated by the dust buffer and the sludge from the evaporator; w/in 30 days of the execution of this Consent Order, the Respondent shall submit to the Division written procedures that were implemented by the Respondent to prevent the violations cited in this Consent Order; w/in 60 days of the execution date of this Consent Order, the Respondent shall submit a Corrective Action Plan for the assessment and remediation of soil and groundwater contamination resulting from the disposal of hazardous waste and/or release of hazardous constituents at the Facility to the Division for approval
Proposed Settlement Amount $32,600.00
Legal Authority Hazardous Waste Management Act
Publication Date For Proposed Order 7/9/2018
Date Comment Period Closes 8/8/2018
Send Comments To Mr. Jeff Cown
Chief, Land Protection Branch
Environmental Protection Division
2 Martin Luther King Jr. Drive SE, Suite 1054 East, Atlanta, GA 30334

Jeff.Cown@dnr.ga.gov

Enforcement Order EPD-WP-8500

Facility City of Dahlonega WPCP
County Lumpkin County
Cause of Order Unpermitted discharge of 4,500 gallons of untreated sewage into unnamed tributary of Cane Creek
Requirements of Order Complete corrective measures and pay penalty
Proposed Settlement Amount $875.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Publication Date For Proposed Order 7/9/2018
Date Comment Period Closes 8/8/2018
Send Comments To Mr. James Cooley
Director of District Operations
Environmental Protection Division
2 Martin Luther King Jr. Drive SE, Suite 1456 East, Atlanta, GA 30334

james.cooley@dnr.ga.gov
(770) 387-4929

Enforcement Order EPD-WP-8526

Facility Chemical Products Corporation
County Bartow County
Cause of Order Unable to comply with effluent limitations established by Permit; exceeded monthly average TSS limit during January 2018; exceeded the daily maximum TSS limit during January 2018; exceeded daily maximum water soluble barium limit during December 2017 and January 2018; exceeded Acute WET limit of Lethal Concentration 50% greater than or equal to 100% effluent September 2017 and March 2018
Requirements of Order Immediately comply with effluent limits established by Permit; begin testing final effluent for compliance with the Acute WET limitation established by the Permit on a quarterly basis; based on results complete Toxicity Identification Evaluation (TIE) and Toxicity Reduction Evaluation (TRE)
Proposed Settlement Amount $1,875.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Publication Date For Proposed Order 7/9/2018
Date Comment Period Closes 8/8/2018
Send Comments To Mr. James Cooley
Director of District Operations
Environmental Protection Division
2 Martin Luther King Jr. Drive SE, Suite 1456 East, Atlanta, GA 30334

james.cooley@dnr.ga.gov
(770) 387-4929

Enforcement Order EPD-WP-8499

Facility Lake Arrowhead Utility Company
County Cherokee County
Cause of Order Unpermitted discharge of 99 gallons of untreated sewage into Lake Arrowhead
Requirements of Order Complete corrective measures and pay penalty
Proposed Settlement Amount $500.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Publication Date For Proposed Order 7/2/2018
Date Comment Period Closes 8/1/2018
Send Comments To Mr. James Cooley
Director of District Operations
Environmental Protection Division
2 Martin Luther King Jr. Drive SE, Suite 1456 East, Atlanta, GA 30334

james.cooley@dnr.ga.gov
(770) 387-4929

Enforcement Order EPD-VRP-015

Facility Parramore Fertilizer Site and SoGreen Waste Pile Site
County Tift County
Cause of Order Replaces existing Hazardous Site Response Act Consent Order EPD-HSR-003 and enroll both sites into the Voluntary Remediation Program
Requirements of Order Complete hydrogeologic evaluation of the SoGreen site within 12 months of execution; complete delineation of soil contamination at the PFS within 24 months of execution; update the site Conceptual Site Models, evaluate remedial options, and finalize the Voluntary Investigation and Remediation Plans within 30 months of execution; submit the Compliance Status Report for each site within 60 months of execution; submit semiannual progress reports
Proposed Settlement Amount
Legal Authority Voluntary Remediation Program Act
Publication Date For Proposed Order 7/2/2018
Date Comment Period Closes 8/1/2018
Send Comments To Mr. Jeff Cown
Chief, Land Protection Branch
Environmental Protection Division
2 Martin Luther King Jr. Drive SE, Suite 1054 East, Atlanta, GA 30334

Jeff.Cown@dnr.ga.gov

Enforcement Order EPD-HW-1863

Facility HWY 17 Auto Sales
County Chatham County
Cause of Order Release of used oil to soil and improper storage of used oil
Requirements of Order Provide plans to properly manage used oil; provide documentation that facility is operating in compliance with approved plans; provide documentation that all released used oil has been cleaned up and managed properly; sample and provide analytical results from nearby drinking water well
Proposed Settlement Amount
Legal Authority Hazardous Waste Management Act
Publication Date For Proposed Order 7/2/2018
Date Comment Period Closes 8/1/2018
Send Comments To Mr. Jeff Cown
Chief, Land Protection Branch
Environmental Protection Division
2 Martin Luther King Jr. Drive SE, Suite 1054 East, Atlanta, GA 30334

Jeff.Cown@dnr.ga.gov