Enforcement Order EPD-WP-8983

Facility JDI Cumberland Inlet, LLC
County Camden County
Cause of Order For the purpose of resolving and disposing of the issues on the property
Requirements of Order Release the stored water to the North River from the outfalls specified as Outfall 1 and 2; conduct laboratory tests of the stored water at a point in the basin near the discharge pipe prior to and during a scheduled release; only release stores water after analytical results confirm that the applicable parameters are not exceeded; retain records to demonstrate the required tests and operating procedures outlined have been met; ensure that stored water will only be discharged from Outfall 1 and/or 2 and not be co-mingled with on-site stormwater then discharged from the stormwater outfalls; all residual sludge associated with the ASB and lagoons should be managed under the oversight of the EPD's Brownfield Unit; decanted water resulting from any sludge handling or dewatering process shall be considered stored water and shall be managed and discharged in accordance with the conditions of this Order
Settlement Amount $0.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Date Executed 9‑Oct‑2020
Publication Date For Executed Order 12‑Oct‑2020
File Attachments None