Enforcement Order EPD-WP-9014

Facility North Perimeter Contractors, LLC
County Fulton County
Cause of Order Failing to install and/or maintain BMPs at the Project as required by the ESPCP and resulting in sediment entering waters of the State; failing to install 2 rows of type "C" silt fence adjacent to state waters; failing to temporarily stabilize all disturbed areas not worked within 14 days; failing to ensure the ESPCP was certified by a Design Professional after any changes which had a significant effect on BMPs with a hydraulic component or when proved to be ineffective at eliminating or significantly minimizing pollutants from entering state waters; failing to documents all incidences of noncompliance in the weekly and post rain BMP inspection reports; failing to ensure a concrete waste methodology was being conducted in accordance with the ESPCP; failing to submit violation summary self-reports; failing to report sediment entering state waters and repair BMPs within 2 or 7 business days; failing to submit violation summary reports within 14 days of discovery of any and all known violations
Requirements of Order Ensure the revision and implementation of the ESPCP and bring Segments 1 and 2 into full Permit compliance; ensure a certified design professional inspects and certifies all BMPs for the phase of construction are installed and maintained in accordance with the revised ESPCP; conduct additional stormwater monitoring and reporting after every 0.5 inch or greater rain event in accordance with the revised ESPCPs and the Permit for all noncompliance disturbed areas that have not met final stabilization; submit a separate CAP for Segment 1 and 2
Settlement Amount $82,661.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Date Executed 16‑Dec‑2020
Publication Date For Executed Order 3‑May‑2021
File Attachments None