Date of Posting: Monday, May 10, 2021

Enforcement Order EPD-WP-8913 Amendment 1

Facility City of St. Mary's
County Camden County
Cause of Order Failure to meet permit limits
Requirements of Order Pay a settlement and provide a revised CAP to address chronic violations
Settlement Amount $4,000.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Date Executed 5/6/2021

Enforcement Order EPD-WP-9076

Facility King America Finishing, Inc
County Screven County
Cause of Order Exceeded discharge limits at the Facility for the parameter Formaldehyde, Acute Whole Effluent Toxicity, and Fecal Coliform; failed to monitor the effluent for Color and THPC; failed to monitor the effluent for Formaldehyde; failed to monitor the Ogeechee River
Requirements of Order Submit investigation results regarding whether the Facility production shutdown/startup procedures, third party laboratory analytical methods and/or procedures, or other issues were responsible for the Permit discharge limit violations and identify potential policies and procedures that will allow for more consistent treatment or control efficiency at the Facility; submit a demonstration that surface water samples collected at the downstream sampling location are in the effluent plume under variable effluent and river flow conditions; evaluate the Facility's Operations and Maintenance Plan and submit proposed procedures for evaluating any planned changes with the Facility's wastewater treatment procedures and revised sampling procedures to avoid Failure to Monitor violations; modify the O&M Plan to incorporate the approved procedures; submit a plan to conduct an alternative analysis regarding treatment technology to allow the Facility to consistently meet Fecal Coliform effluent limitations
Settlement Amount $31,000.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Date Executed 5/5/2021

Enforcement Order EPD-AQC-7080

Facility Savannah Marine Terminal
County Chatham County
Cause of Order Failure to obtain an operating permit for the Savannah Facilities and the Guyton Facility; failure to submit an application for an operating permit within 30 days of commencement of normal operations; failure to pay to EPD an annual fee for calendar years 2017 through 2019; failure to submit a complete Part 70 Permit application within 12 months after commencing operation
Requirements of Order Submit a complete Part 70 Permit Application for the operations at the Savannah Facilities; Costs shall be submitted for all control devices and equipment necessary to meet Air Toxic Guidelines; Submit a complete Permit Application for the operations at the Guyton Facility; Complete the online fee reporting form for calendar years 2017 through 2019 and submit payments; submit payment for the 2020 Permit Fees
Settlement Amount $22,701.00
Legal Authority Air Quality Act
Date Executed 5/3/2021

Enforcement Order EPD-WP-9063

Facility North Perimeter Contractors LLC
County Fulton County
Cause of Order NPDES Permit violations and sediment in state waters
Requirements of Order Pay monetary settlement, design and implement a Corrective Action Plan to return the site to compliance and restore state waters, pay stipulated penalty if compliance is not achieved by required dates
Settlement Amount $318,750.00
Legal Authority Water Quality Control Act (including Surface Water Allocation)
Date Executed 5/3/2021